Technical Guide
Field-oriented notes for crane wire rope replacement, drum winding and post-installation inspection.
Crane wire rope replacement requires attention to rope construction, winding direction, drum groove condition and termination method.
After installation, the rope should be loaded gradually and inspected for winding, crushing, twist and abnormal contact. Incorrect installation may shorten rope life.
Onur Çelik Halat provides product selection and field-oriented support for crane and hoist rope applications.